Problem
Paradox Shop's order-history dashboard reads from a materialized view; a read-optimized projection kept current by a projector worker consuming a change-event queue, already wired up below. During today's write spike the projector fell behind: 90,000 change events are backed up and the queue keeps growing, so the dashboard shows numbers that are minutes stale. Fix the projector worker pool so it keeps up with new change events (750/sec) and catches the read model up to a fresh state within 30 minutes. Keep the projector wired to the read-model store as part of a complete design; note that only projector throughput, drain time, and cost are graded, not the read-model wiring itself.
Required components
Click to add a component to the canvas.
Additional components
Browse by category. Click or drag a component onto the canvas.